Construction Completion Tours
Grand Opening Ceremonies
2022-23 School Year Construction Videos
September 2022 Construction Tours
August 2022 Construction Videos
July 2022 Construction Videos
June 2022 Construction Videos
Maine West’s New Commons – Grand Opening
Maine West Full Timelapse of Cafeteria
Maine West’s Cafeteria Remodel – In Progress
Tours of Remodeled Spaces – August and September 2021
August 6, 2021 Construction Updates
Summer of 2021 Construction Tours
Maine South Construction Update (June, 2021)
Maine East Center Court Construction (Feb. 2021)
Beginning of 2021 Construction Tours
Architects Walk Through of Construction Plans (Oct.2020)
Construction Tours – June 2020
Construction Progress – Early June 2020
Virtual Groundbreakings
Architects Walk Through of Construction Plans (May 2020)
Tours of Planned Upgrades (February 2020)
Referendum Videos
These videos were designed to provide residents of Maine Township High School District 207 with information about the referendum prior to the vote in the fall of 2018.
This two-minute video provides an overview of the referendum information and how funds will be used.
This two-minute video provides insight into the safety and security improvements.
This two-minute video provides information related to the infrastructure upgrades.
This two-minute video provides a glimpse at the classroom updates and school changes to create flexible learning spaces that promote collaboration.
These four short videos provide more in-depth information on a particular portion of the ballot question including security vestibules, access for special needs students, the classroom environment and students walking outside between classes.
Presentation from Dr. Wallace: This six-minute video from Superintendent Dr. Ken Wallace provides an overview of the referendum and how funds will be utilized.